The following brief instructions intend to assist and advise upon a generator set installation in order to ensure the best possible results for the user-owner

TNL Enigneering engineer will work closely with customer for site survey, engineering design and arranging for site installation, testing, commissioning the genset package following basic step as below:

Proper ventilation of the installation site/room 

For correct engine combustion and heat dissipation of the motor, plenty amount of air is required. All the specific information for the needed volume of fresh air of each genset model is included in its technical brochure.

Rising temperatures within the installation and operating site of a genset must not exceed 8° - 12°C above the ambient temperature.

Exhaust system

Exhaust piping and silencer should be installed in a way that will allow sufficient space for service access to the maintenance technicians. Proper piping support is crucial to prevent vibration transmission to the generator set.

The entire exhaust system must be properly insulated to avoid heat dissipation/transfer to the installation room.

Finally, for the correct generator set operation, the back pressure of the entire exhaust system should be taken into account and must not exceed the recommended manufacturer limits.

Mounting of a generator set

For the proper generator set operation it is crucial to build a completely leveled base/foundation, thus offering adequate seating for the unit. The base/foundation should be of sufficient strength based on the weight of each specific generator set. A proper seating does not affect the critical engine-alternator alignment. A generator set installation on an unleveled surface can cause damages such as distortions of the engine block and torsional stress to the welding and engine foundation iron.

Ιn high-power generating sets (over 1000kVA), special anti-vibration equipment (rubber/spring), which is placed between the generator set and its installation surface (base/foundation) for further vibration isolation. A general rule is to place one pair of anti-vibration rubber/spring near the center of gravity of the generator set and the remaining pieces in equal distances in order to equally distribute the weight of the generator set.

In addition, adequate space around the generator set is necessary for its proper operation as well as for easy access of the service technicians during maintenance intervals (a distance of about 1 meter perimeter is quite satisfactory).

Connecting a generator set 

For correct connection of power generators, special attention should be given to the following*:

  1. Connect the generator set with the automatic transfer panel using a 2x1 shielded cable in order to avoid induced currents.
  1. Connect a 220V power supply to the generator set’s control and operation panel for battery/ies maintenance (battery charger) as well as for engine preheat system (if included)

Battery system

For the direct/auto-start of the generator set, its battery system should be always under load. For this purpose,
the battery charger must always be connected to the power supply (220V).

Engine fuel

The quality of the diesel fuel used affects the engine performance.

Also, the fuel level within the tank is important to be at a lower point than the combustion system (burner, oil pump, etc) to avoid the pressurizing the whole fuel system.

Proposed inspections during operation of generator sets 

The following actions should be followed by the operator of a generator set in order for the genset to operate and perform at its full capacity*:

  • Visual check of the fuel tank for any oxidations.
  • Fuel level check. Fill up if necessary.
  • Engine oil level check. Fill up if necessary.
  • Cooling system antifreeze level check. Fill up with the special CATERPILLAR antifreeze fluid if needed.
  • Check the voltage of the batteries and charger.
  • Visual inspection for leakages.
  • Engine temperature check (only if pre-heater is installed).

****************************************************************************

TNL Engineering as “one stop shop” service provider for generator set package installation and its ancillaries system including:

Exhaust system:

  • Exhaust silencer
  • Flexible fitting
  • Y-dapter
  • Exhaust accessories: exhaust pipe, rain cap, hanger, flange….
  • Exhaust pipe insulation

 Fuel system:

  • Daily fuel tank, fuel storage tanks
  • Fuel pump package
  • Fuel control panel
  • Fuel level switch
  • Accessories: valve, pipe, indicator, gauge..

Ventilation system:

  • Intake/ outlet air louver
  • Intake/ outlet Attenuator
  • Sound absorption panel

Genset control panel

Automatic transfer switch  (ATS)

Synchronizing panel

Switch gear

Service :

  • Load test
  • Electrical system upgrading
  • Maintenance

 

 

Related post

DỊCH VỤ LẮP ĐẶT MÁY PHÁT ĐIỆN NHANH CHÓNG, TIỆN LỢI

18. 11. 2019

Máy phát điện hiện không còn là một vật dụng khó tìm trong cuộc sống hiện đại. Với số lượng dân cư đông đúc tại những trung tâm công nghiệp lớn thì việc dự trữ điện là một việc cần thiết tại mỗi doanh nghiệp. Nếu bạn đang phân vân…

SITE PLANNING FOR AN INDUSTRIAL GENERATOR INSTALLATION

23. 12. 2019

This article explores different options available for various types of emergency generator applications. The applications discussed include generators exposed to weather and generators located inside of a facility.